Confidential Heating Loop
Client: Confidential
Summary: This project entails a full replacement and modernization of the existing heating loop within the building. The upgraded system will feature a high-efficiency closed-loop design, utilizing a nitrogen/glycol fluid mix to provide optimal freeze protection and year-round reliability. The scope includes the removal of outdated piping and components, followed by the installation of new, high-performance piping, advanced valving assemblies, and comprehensive system insulation.